Saturday, March 22, 2008

Basement almost finished...

The basement is the first room we painted. We are using non-toxic Mythic Paint in the entire house, making our abode as green as possible. So with the walls painted, we just need to take out the existing carpet and decide on a floor (either new carpet or some type of laminate). It would be nice to use sustainable bamboo for the flooring, but costs might be too much for the current budget. With the walls painted, I think we can live with the existing concrete floor for a while.


This is the before (taken during home inspection back in January):

And the after:

No comments:

Post a Comment